TURN OFF ALL POWER BEFORE BEGINNING YOUR INSTALLATION
SoftStartRV Wiring Diagram for Dometic Brisk I and II
Instructions
Copyright © MMXXII NetworkRV LLC. All Rights Reserved.
TURN ALL POWER OFF BEFORE STARTING
INSTALLATION.
Route Blue, Black and Yellow
SoftStart wires into the electrical box. Then crimp Connectors onto all SoftStart
wires as indicated in drawing.
Step 1. Follow White Compressor
Wire from Compressor to Run Capacitor “C” terminal. Disconnect from “C”
terminal and connect it to Blue SoftStart wire.
Step 2. Connect Black SoftStart
wire to the terminal that the White Compressor Wire was on.
Step 3. Connect Yellow SoftStart
wire on terminal next to Red Compressor Wire on “Herm”
Side of Run Capacitor.
Step 4. IF you see a second Red
wire next to the Red Compressor Wire, disconnect it and seal end with
electrical tape.
Step 5. Follow Black Compressor
wire to the Start Relay. Disconnect both Black and Purple wires, and connect
them to Brown SoftStart wire. Seal connection with electrical tape.
Step 6. Connect Red SoftStart wire
onto the terminal that the Black Compressor Wire was on.
Secure all wires. Tape connections
with electrical tape.
Turn Power and A/C Breaker on. Turn
A/C to Auto Cool setting and set the thermostat to 55ºF.
Look at SoftStart LED lights. Green
light should be “on”. Green light means the Compressor is running (there may be a full
3-minute delay before Green light comes on). IF there is no Green light after 4
minutes, call SoftStart Tech Support for assistance.
After establishing Green light
operation, re-install all A/C covers.
Turn A/C on, set near to outdoor
temperature and run for 30 minutes. After 30 minutes, operate A/C normally.
Route
Blue, Black and Yellow SoftStart wires into the electrical box. Then crimp Connectors
onto all SoftStart wires as indicated in drawing.
Step 1.
Follow White Compressor Wire from Compressor to Run Capacitor “C” terminal.
Disconnect from “C” terminal and connect it to Blue SoftStart wire.
Step 2.
Connect Black SoftStart wire to the terminal that the White Compressor Wire was
on.
Step 3.
Connect Yellow SoftStart wire on terminal next to Red Compressor Wire on “Herm”
Side of Run Capacitor.
Step 4.
IF you see a second Red wire next to the Red Compressor Wire, disconnect it and
seal end with electrical tape.
Step 5.
Remove Compressor cap. Disconnect Blue Compressor Wire and connect to Red
SoftStart wire. Tape connection.
Step 6.
Connect Brown SoftStart wire onto the terminal that the Blue Compressor Wire
was on.
Secure
all wires. Tape connections with electrical tape.
Turn
Power and A/C Breaker on. Turn A/C to Auto Cool setting and set the thermostat
to 55ºF.
Look at
SoftStart LED lights. Green light should be “on”. Green light means the
Compressor is running (there may be a full 3-minute delay before Green light
comes on). IF there is no Green light after 4 minutes, call SoftStart Tech
Support for assistance.
After
establishing Green light operation, re-install all A/C covers. Turn A/C on, set
near to outdoor temperature and run for 30 minutes. After 30 minutes, operate
A/C normally.